Home  »  Engineer's Desktop 5000.15



Engineer’s Desktop 5000 .15

Faced with ambitious drilling schedules, reduced budgets, and more complex reservoirs, the exploration and production industry today requires a solution that brings together asset teams with the goal of faster, smarter, safer results. The one complete and integrated well construction software suite on the market is Landmark Engineer’s Desktop™ (EDT) 5000.15.

This application continually adds new science to help companies thrive in the age of drilling intelligence. Engineer’s Desktop™ (EDT) 5000 .15 application runs on a shared data model, facilitating business process management and supporting the Well Construction Lifecycle through aiding in enhanced drilling operation efficiency. Thereby, allowing operators to take control of their well data, and through deep integration with the industry's broadest portfolio of well engineering solutions, help drive better well construction decisions.

Engineer's Data Model »


well construction lifecycle 



“The industry’s most integrated suite of well construction lifecycle applications”

Plan

Planning starts with a clear understanding of subsurface properties, sweet spots, and field development goals. Risk mitigation and cost analysis must be part of the equation.

COMPASS »

COMPASS™ offers a fast, more accurate means of well planning and identification of potential directional drilling or anti-collision problems at early stages.

Well Cost »

Well Cost provides engineers with the ability to generate cost estimates for budgeting purposes and the more detailed Authorization for Expenditure (AFE).


Design

Enable wellbore design geometries for maximum contact with the most productive reservoir zones. Well designed with an eye on long-term productivity.

CasingSeat»

Provide rigorous shoe selection calculation to optimize shoe locations based on pore pressure, fracture gradients, and user-defined design constraints. CasingSeat™ is fully integrated with StressCheck™.

StressCheck»

StressCheck™ helps enable the user to quickly, systematically, and more accurately evaluate casing wear limits, minimum cost design, and working-stress design for burst, collapse, axial installation, and service-life load cases.

WellPlan»
WellPlan™ helps enable the engineer to improve well designs, help prevent stuck pipe and BHA failures, help prevent drilling problems, and essentially help to drill the right wells the first time at a lower cost.

CasingWear »
CasingWear™ is the next-generation of well integrity applications to help predict locations and magnitudes of cased pipe damage due to the friction and galling of drilling operations.

WELLCAT»
WELLCAT™ is the tool of choice for many companies operating in high-pressure, high-temperature (HPHT) deepwater or heavy oil drilling and production environments.


Execute

Through drilling monitoring and optimization, engineers stay on top of the job and identify drilling deviation.

OpenWells® »
Comprehensive reporting solutions to track report and analyze rig operations from site sourcing through to abandonment.

Analytics »
Leverages the industry standard Engineer’s Data Model™ (EDM) for data stored access to help continuously improve drilling performance and help avoid Non-Productive Time.


Review

As drilling and completions occur, operators must monitor performance, compare it against what was planned, and even foresee upcoming nonproductive time. 

Analytics »
Leverages the industry standard Engineer’s Data Model™ (EDM) for data stored access to help continuously improve drilling performance and help avoid Non-Productive Time.

CasingWear»
CasingWear™ is the next-generation of well integrity applications to help predict locations and magnitudes of cased pipe damage due to the friction and galling of drilling operations.

WELLCAT»
WELLCAT™ is the tool of choice for many companies operating in high-pressure, high-temperature (HPHT) deepwater or heavy oil drilling and production environments.

 



CasingWear Case Study


Recommended For You:


Related Articles


Our Digital Solutions


Well Construction 4.0

The ability to integrate, automate, analyze, and optimize with real-time data is a major breakthrough in helping to successfully predict and analyze Invisible Lost Time (ILT) and Non-Productive Time (NPT) -- before they happen.

Learn more »

DecisionSpace® 365

Now the burden of buying, deploying, maintaining and supporting onsite E&P software can be a thing of the past. Eliminate high costs, gain mobility, and shift to Digital E&P with DecisionSpace® 365 on iEnergy® Cloud.

Learn more »

Digital Well Program

Apply digital twin using digital well program for lean process execution and help optimize drilling decisions

Learn more »

Planar Client Options
Layout Style
  • Wide
  • Boxed
Theme Preview